A Winton Extension

This slideshow requires JavaScript.

As plastering contractors we do a wide range of jobs. This week we have been helping to finish off a new extension in Winton.

The instructions from Building Control asked for a vapour barrier over the OSB (oriented strand board or Sterling Board) to make sure that moisture and damp were not going to effect the building over time. We were called in to fit the vapour barrier and then tack 12.5mm (half inch) British Gypsum plasterboard on the walls, ceiling and around the feature skylight. All of this was done in accordance with British Standards using drywall screws ready for plastering.

The last part of the job was to plaster the room to a beautifully smooth finish and clear up behind ourselves.

Another happy customer for The Dream Team!

This entry was posted in domestic, extension and tagged , , , , , , , , , . Bookmark the permalink.

Leave a comment